Cost calculation, AVA and HOAI and CAD in construction with ALLPLAN
Free of cost
by funding
-
Certificates: Original ALLPLAN certificate
Certificate "Cost calculation, AVA and HOAI in construction" -
Examination: Practical project work with final presentations
-
Teaching Times: Full-timeMonday to Friday from 8:30 a.m. to 3:35 p.m. (in weeks with public holidays from 8:30 a.m. to 5:10 p.m.)
-
Language of Instruction: German
-
Duration: 12 Weeks
CAD with ALLPLAN
User interface (approx. 1 day)
Menus, action bar, dialog boxes, options
Construction 2D (approx. 3 days)
First steps: Measure line, circle, polygon course
Point snap, tracking, track lines, track points
Editing functions, modification functions
Layer use and format properties
Modifying format properties, layer palette
Hatching, pattern, fill area
Modify 2D surface elements
Pattern line, direct modification via object handles
Modify points, 2D dimensioning, text input
Project organization (approx. 1 day)
New project, level model
Building structure, drawing files
Artificial intelligence (AI) in the work process
Presentation of specific AI technologies
and possible applications in the professional environment
3D shell construction (approx. 4 days)
Window settings and view types, walls/settings
Walls, windows, doors properties, bonding behavior
Walls, windows, doors properties, change properties
3D change and editing functions
Dimensioning 3D, copy across documents
Handle modification Modify component points
SmartParts (approx. 1 day)
Create window and door SmartParts, save in library
Topic Wizards
Classic stairs (approx. 2 days)
Straight staircase, quarter-spiral staircase, staircase components and modification options
Quarter landing staircase, half landing staircase, spiral staircase and modification options
Staircase modeler (approx. 1 day)
Quarter landing staircase
Staircase modifications with staircase modeler
Modification options
Railing modeler (approx. 1 day)
Railings on ceilings (balcony) and stairs
Settings, railing variants
Roof shapes (approx. 2 days)
Roof level, roof level geometry, roof cladding
Roof landscape, roof windows, roof window SmartPart
Roof plane, roof plane geometry and roof cladding for L-shaped floor plan
Dormer windows (approx. 2 days)
External and internal dormers, dormer level, dormer components
Mirroring and copying the roof structure (dormer level)
Mirroring and copying dormer components
Roof construction (approx. 2 days)
Rafter installation
Purlins
Derivations (approx. 3 days)
Structural levels, cutting and derivations
Modification options: Sectional derivation and routing, building model
derivation
Views and perspectives
Modification options: View derivation, building model
Addition to foreground: Elevation dimensioning, terrain connection lines, 2D library elements
Background addition: pattern areas, fill areas
Derivation of horizontal section
Plan layout (approx. 2 days)
Plan structure levels, page layout, plan elements
Plan elements, plan frame and plan header
Editing plan elements
Plan window, project and plan attributes, labeling images, add plan header
Pixel areas, plan template
Print settings, plan output, exporting plans as PDF
Interior fit-out (approx. 3 days)
Room definition, fit-out and area parameters
Assign *.surf files
Special side and special floor areas, room evaluation using report lists (floor area, fit-out)
Special side and special floor areas
3D furnishing, modifying macros, modifying/scaling *.surf files
3D surface objects, 3D bodies, 3D modeling
Visualization (approx. 2 days)
Environment variables, outdoor area, 3D objects (trees, paths etc.)
Rendering with Cineware: outdoor area, render settings, background
Rendering with Cineware: Interior, render settings
Project light, 3D lamp, macro light, camera panning, sun study
Project work (approx. 10 days)
To consolidate the content learned
Presentation of the project results
Cost calculation, AVA and HOAI in the construction industry
Cost planning in construction (approx. 6 days)
Overview: Cost statements for the service phases (1-9)
Standards and regulations
DIN 276-1 Costs in construction
DIN 277-1 Floor areas and room volumes
WoFlV Living Space Ordinance
Determination of areas and room contents
Floor areas and room contents
Living space
Assignment of quantities and reference units
Consolidation of DIN 276
Scope of application
Structure of the cost breakdown
Cost determination
Cost estimation
Cost calculation
Cost estimate
Quantities and reference units
Working with the BKI Cost Planner
Presentation of a software-based solution
Basic functions of the BKI Cost Planner
Cost estimation and calculation with BKI reference objects
Plausibility checks
Print output and export options
Artificial intelligence (AI) in the work process
Presentation of specific AI technologies
and possible applications in the professional environment
AVA - Tendering, awarding and invoicing of construction services (approx. 7 days)
VOB - Contract award and contract regulations for construction services
VOB Part A - Contract award by contracting authorities
Service description
Award procedure and award provisions
VOB Part C - General Technical Contract Terms for Construction Work
Trade-specific regulations for construction work
VOB Part B - General conditions of contract
Special contractual conditions
Additional Technical Terms of Contract
Notice of obstruction and notification of concerns
Acceptance and invoicing
Claims for defects and limitation periods
Working with Orca AVA
Presentation of a software-based solution
Project master data
Cost estimation/calculation
Cost breakdowns DIN 276 and STLB Bau
Tendering with service specifications
Digital request for quotation (GAEB)
Comparison of offers with price comparison lists
Contract awarding
Supplement management
Billing via measurement check and invoice approval
Digital quantity takeoff
Layout and print output
Data interfaces (import/export)
Cost transfer from the BKI cost planner
Orca AVA and Building Information Modeling (BIM)
Overview HOAI (approx. 2 days)
Scope of application
Structure and main contents
Fee assessment basis
Allocability of the cost calculation to the fee calculation
Assessment and allocation to fee zones
Basic services and special services
Services for several properties
Conversion and modernization surcharge
Final invoice
Architect's contract and liability law
Project work (approx. 5 days)
To deepen the contents learned
Use of Orca AVA and the BKI cost planner
Presentation of the project results
Changes are possible. The course content is updated regularly.
Once you have completed this course, you will be able to use ALLPLAN quickly and confidently.
After this course, you will also have knowledge of cost calculation according to DIN 276, the new HOAI and software-supported AVA (tendering, awarding and invoicing) with the ORCA program.
The course is aimed at people with a degree in architecture and engineering, technicians, draughtsmen and technical draughtsmen as well as specialists from related industries with appropriate professional experience.
The ALLPLAN software (formerly: Nemetschek) is the market leader in the field of architecture and is used in architecture and engineering offices of all sizes.
Additional knowledge of cost calculation, HOAI and AVA is essential in all phases of a project and increases your chances on the job market.
Your meaningful certificate provides a detailed insight into the qualifications you have acquired and improves your career prospects.
Didactic concept
Your lecturers are highly qualified both professionally and didactically and will teach you from the first to the last day (no self-study system).
You will learn in effective small groups. The courses usually consist of 6 to 25 participants. The general lessons are supplemented by numerous practical exercises in all course modules. The practice phase is an important part of the course, as it is during this time that you process what you have just learned and gain confidence and routine in its application. The final section of the course involves a project, a case study or a final exam.
Virtual classroom alfaview®
Lessons take place using modern alfaview® video technology - either from the comfort of your own home or at our premises at Bildungszentrum. The entire course can see each other face-to-face via alfaview®, communicate with each other in lip-sync voice quality and work on joint projects. Of course, you can also see and talk to your connected trainers live at any time and you will be taught by your lecturers in real time for the entire duration of the course. The lessons are not e-learning, but real live face-to-face lessons via video technology.
The courses at alfatraining are funded by Agentur für Arbeit and are certified in accordance with the AZAV approval regulation. When submitting a Bildungsgutscheinor Aktivierungs- und Vermittlungsgutschein, the entire course costs are usually covered by your funding body.
Funding is also possible via Europäischen Sozialfonds (ESF), Deutsche Rentenversicherung (DRV) or regional funding programs. As a regular soldier, you have the option of attending further training courses via Berufsförderungsdienst (BFD). Companies can also have their employees qualified via funding from Agentur für Arbeit (Qualifizierungschancengesetz).